12V-150AH MORO蓄电池【摩罗】厂家销售部供应
2023-09-06 10:21  点击:282
价格:未填
发送询价
12V-150AH/MORO蓄电池【摩罗】厂家销售部供应
12V-150AH/MORO蓄电池【摩罗】厂家销售部供应
12V-150AH/MORO蓄电池【摩罗】厂家销售部供应
A. battery capacity conversion curve
B. for 5 seconds and 1 minute discharge characteristic curve
C. Float charging pressure and temperature curve
D. Floating battery life and temperature curve
E. Different ratio for battery discharge impulse discharge current curve after 1 hour
F. Different ratio for battery discharge impulse discharge current curve after 0.5 hours
G. Battery capacity and discharge time curve
H. Different battery discharge rate, voltage and time relation curve
For all provide engineering special seal shall be affixed to the drawings, and for the final drawings.
7.1 the basic requirements
7.1.1 during this part for the implementation of the contract party to the quotation of the equipment supplied by inspection and performance test experiment was carried out, ensure the equipment to be provided by quotation in compliance with the requirements of the technical specification. Equipment and its main components are conducted in accordance with relevant state standard type test, factory test, all kinds of test are conducted according to relevant standards and regulations of the state. Each group, all battery factory experiment was carried out, and to provide a complete test report and factory test reports and test acceptance criteria.
7.1.2 offer party shall within one month after the contract comes into force, to make an inquiry in connection with this contract equipment to be supplied by inspection, performance acceptance test criteria, and in the test report will be a month ago test standards, plans and reports to send inquiry party inspection. Relevant standards shall comply with the provisions of the technical specification.
7.1.3 offer will match all equipment field test of the machine.
7.1.4 inquiry think a test condition, content, procedure, measure and record any item is not in conformity with the relevant requirements, shall have the right to refuse to accept the test report to redo the test.

Second, sale service commitments
1, adopt the unified national industrial products sales contract and you sign a contract and technical agreement.
2, consciously abide by the provisions of the contract law, ensure the smooth performance of the contract and technical agreement.
3, to volume on time to provide you with quality products, and the optimal transportation mode is adopted to ensure that you receive the goods intact.
4, actively communicate with use, respect for users, to provide users with thoughtful technical support.
5, according to the provisions of the contract for you to provide inspection, installation, commissioning and training services.
6, regardless of the size of the contract, all the customers in terms of price and service is fair.

Three, after-sales limited-time service commitments
1. We will be according to the requirements of customers to provide relevant technical training and technical data.
2. The product has quality problem, one year free warranty, life-long maintenance, have agreed in the contract as agreed in the contract.
3, we guarantee that the telephone guidance in 15 minutes, by you to rule out the simple failure of equipment.
4, for UPS power supply under 10 kilograms, troubleshooting within two days, or provide new equipment for you to use temporarily, until the damage to the equipment repaired.
5, UPS power supply for more than 10 kilograms, troubleshooting within three days, or provide new equipment for you to use temporarily, until the damage to the equipment repaired.
6, we sell the equipment 3 years free maintenance, life-long maintenance, long-term to provide spare parts, free software upgrades, except as provided in the contract.

联系方式
公司:北京华达富通电源设备有限公司
状态:离线 发送信件 在线交谈
姓名:赵琦经理(女士)
职位:经理
电话:010-56131566
手机:13260272006
传真:010-80326441
地区:北京
地址: 北京市海淀区中关村科技园A区203
邮编:100092
邮件:3403697441@qq.com
QQ:3426760869
阿里旺旺:北京华达富通电源设备有限公司
Skype:liheng